WHRO LIVE LISTEN WATCH EDUCATE ABOUT SUPPORT US DONATE CONTACT US ENEWS myWHRO

THIS OLD HOUSE

WATCH NOW ON DEMAND

Friday, March 27th

2:00am on
Runtime: 00:27:00
Widescreen

Needham Foot Traffic

Jenn and Mark build a backyard brick patio. Meanwhile, Kevin visits a lumber business to see the homeowners new floors being made. Later, Kevin and Charlie work to weave in salvaged floor strips with the original flooring.

2:30pm on
Runtime: 00:24:51
Widescreen

Ipswich Factory Built

Kevin gives a full progress tour. Rainwater management is discussed, and a harvesting system is installed. A handmade lighting factory is toured. The new boathouse, built in a factory, is assembled on site. Plants are heeled in for the winter.

Saturday, March 28th

8:30am on
Runtime: 00:27:00
Widescreen

Needham Trim and Proper

Charlie visits a made-to-order window trim factory in Springfield, MA. Later, he and Tom install edge boards on the new deck. Kevin joins later to finish the tongue-and- groove decking. In the front yard, Jenn and Patrick discuss landscaping plans.

1:30pm on
Runtime: 00:27:00
Widescreen

Needham Foot Traffic

Jenn and Mark build a backyard brick patio. Meanwhile, Kevin visits a lumber business to see the homeowners new floors being made. Later, Kevin and Charlie work to weave in salvaged floor strips with the original flooring.

Monday, March 30th

2:30pm on
Runtime: 00:24:51
Widescreen

Ipswich New Life

A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.

Tuesday, March 31st

2:30pm on
Runtime: 00:24:51
Widescreen

Ipswich Look-Alike

Finishing touches are revealed. New wide plank floorboards mimic the look of the original flooring. A soapstone sink is fabricated offsite. The hot water system is reviewed. A wood backsplash goes in the pantry and light fixtures illuminate the ell.

Saturday, April 4th

8:30am on
Runtime: 00:27:00
Widescreen

Needham Foot Traffic

Jenn and Mark build a backyard brick patio. Meanwhile, Kevin visits a lumber business to see the homeowners new floors being made. Later, Kevin and Charlie work to weave in salvaged floor strips with the original flooring.

1:30pm on
Runtime: 00:27:00
Widescreen

Needham Going Through Customs NEW

Heath lays out the wiring for radiant floor heating before tile goes down in the bathroom. Meanwhile, Kevin visits a custom cabinet shop on Cape Cod to see the kitchen cabinets being made. Later, Tom, Charlie, and Kevin work on the built-in bookcase .

Saturday, April 11th

1:30pm on
Runtime: 00:27:00
Widescreen

Needham Everything Old Is New Again NEW

Kevin and Charlie relocate and rebuild the original built-in China cabinet in the new dining room. Heath shows Kevin the proper layout and height before installing bathroom sconces. Meanwhile, Tom preps the front door for a new mortise lock.

Saturday, April 18th

1:30pm on
Runtime: 00:27:00
Widescreen

NEW

It's moving day in Needham, as the renovation of the 1890s Victorian wraps up. The crew tours the house, which has a brand-new back extension, reconfigured layout and a primary bathroom. The location of the next project is revealed.

Saturday, April 25th

1:30pm on
Runtime: 00:27:00
Widescreen

NEW